Big River
Big River Project – Overview
Tenement: EP 60448
Area: 44.87km2
Ownership: 100%
Historical Production: Big River closed in 1942 due to WWII. Historical production of 136koz @ 34.1g/t Au (cut off grade ~15g/t Au). Mined to 560m from 12 levels
4km+ Anomalous Strike Length
The Big River gold project consists of 6 identical gold mineralised shoots across more than 500m of strike, with the potential to discover additional high-grade shoots.
Maiden Mineral Resource Estimate
Inferred MRE 105koz @ 3.94g/t Au at a 1.5g/t cut-off (Shoot 4 & A2 Shoot only).
The Big River deposit remains open in all directions with significant potential for increased gold resources from additional exploration drilling.
Drilling
Historical Productions
- Big River project lies 15km south-east of Reefton and includes the historic Big River Mine, which produced ~136,000 oz of gold at an average recovered grade of 34g/t between 1880 and 1942 down to 550m.
- Four main ore shoots were mined (Shoots 1-4) with two potential unmined shoots; the A2 and Prima Donna, located east and west of the Big River mine.
- The A2 shoot, Big River Mine and Prima Donna shoot combined cover a strike length of around 500m, which is overlaid by anomalous gold and arsenic soil geochemistry.